5.8 KiB
NT8 Institutional SDK - Phase 1 Project Plan
Project Overview
This document outlines the Phase 1 development plan for the NT8 Institutional SDK. Phase 1 builds upon the completed Phase 0 foundation to deliver a more complete trading system with Order Management System (OMS), NinjaTrader 8 integration, enhanced risk controls, and market data handling.
Project Information
- Project ID: 5652a2b1-20b2-442f-9800-d166acf5cd1d
- Title: NT8 Institutional SDK
- Phase: Phase 1 Development
- Status: In Progress
Phase 1 Objectives
- Implement Order Management System (OMS) with smart order routing
- Develop NinjaTrader 8 adapter for integration
- Enhance risk controls with Tier 2 functionality
- Implement market data handling and validation
- Optimize system performance and add advanced algorithms
Created Tasks
1. Order Management System (OMS)
Task ID: 074d41ec-2947-4efd-9d77-d85ed24c29bf Status: todo Feature: oms
Implementation of a comprehensive OMS with smart order routing and execution algorithms:
- IOrderManager interface and OrderManager class
- Support for Market, Limit, StopMarket, and StopLimit orders
- Order validation logic
- Smart order routing based on liquidity and cost
- Multiple execution venues support
- Routing configuration system and performance metrics
- Execution algorithms (TWAP, VWAP, Iceberg)
- Algorithm configuration and parameterization
- Integration with existing risk management system
- Order rate limiting and value limits
- Circuit breaker functionality
2. NinjaTrader 8 Adapter
Task ID: e5771a2f-e7bf-46ad-962e-b2ceb757e184 Status: todo Feature: nt8-adapter
Development of a robust adapter for integrating with NinjaTrader 8 platform:
- INT8Adapter interface and NT8Adapter class
- Connection state management
- Error handling and recovery
- Real-time market data reception
- Market data subscription mechanism
- Support for different bar types and intervals
- Data quality checks and validation
- Buffering and throttling for high-frequency data
- Order execution through NT8
- Order submission, status tracking, and updates
- Order cancellation and modification
- Execution reporting and fill handling
- NT8-specific data formats and conventions
- Data type conversions and instrument definitions
- Session and trading hours handling
- NT8-specific error codes and handling
3. Enhanced Risk Controls (Tier 2)
Task ID: 655c0a70-a5e4-49f-bad1-3f6bac9e70a6 Status: todo Feature: risk-management-tier2
Extension of the risk management system with advanced Tier 2 controls:
- Portfolio-level risk controls
- Cross-symbol correlation analysis
- Portfolio VaR (Value at Risk) calculations
- Concentration limits by sector/asset class
- Portfolio-level stop-losses
- Advanced position tracking and management
- Enhanced position tracking with Greeks and risk metrics
- Position reconciliation mechanisms
- Position flattening algorithms
- Position reporting and visualization
- Transaction cost analysis
- Slippage tracking and analysis
- Commission and fee tracking
- Transaction cost reporting
- Cost vs. benefit analysis tools
- Scenario analysis and stress testing
- Historical scenario analysis
- Monte Carlo simulation capabilities
- Stress testing framework
- Scenario result visualization
4. Market Data Handling
Task ID: 8d6c7fa7-9b97-41be-a44c-d26079ae04e7 Status: todo Feature: market-data
Implementation of comprehensive market data handling and validation:
- Market data provider interface and MarketDataProvider base class
- Support for multiple data sources
- Data source failover mechanisms
- Market data quality validation
- Data quality checks (gaps, spikes, etc.)
- Data freshness monitoring
- Data validation rules engine
- Alerts for data quality issues
- Historical data handling
- Historical data retrieval support
- Data storage and caching
- Data compression and archiving
- Historical data analysis tools
- Real-time market data analytics
- Real-time volatility calculations
- Volume and liquidity analytics
- Market regime detection
- Real-time data visualization
5. Performance Optimization
Task ID: 597edb61-d818-4ed0-b6f0-6d55ec06a470 Status: todo Feature: performance
System performance optimization and advanced algorithms:
- Core system performance optimization
- Profiling and optimization of critical code paths
- Object pooling for frequently used objects
- Caching mechanisms for expensive calculations
- Memory usage and garbage collection optimization
- Advanced position sizing algorithms
- Optimal f algorithm
- Kelly criterion sizing
- Volatility-adjusted sizing methods
- Machine learning-based sizing approaches
- Comprehensive monitoring and logging
- Performance counters and metrics
- Distributed tracing support
- Enhanced logging with structured data
- Monitoring dashboard
- Parallel processing implementation
- Opportunities for parallelization
- Thread-safe data structures
- Async/await patterns
- Resource utilization optimization
Success Criteria
- OMS implemented with smart order routing and execution algorithms
- NT8 adapter successfully integrated and tested
- Tier 2 risk controls operational with portfolio-level management
- Market data handling robust with quality validation
- System performance optimized with measurable improvements
- All new functionality covered by automated tests (>90% coverage)
- Documentation updated for all new components
Next Steps
- Begin implementation of Phase 1 tasks following the Archon workflow
- Update task status from "todo" to "doing" when work begins
- Conduct research for each task using Archon's research capabilities
- Implement solutions based on research findings
- Update task status to "review" upon completion
- Create new tasks as needed for Phase 2 development