3.6 KiB
NT8 Institutional SDK - Phase 1 Development Kickoff
Project Status Update
As of September 9, 2025, the NT8 Institutional SDK has successfully completed Phase 0 development and is now entering Phase 1. All core components have been implemented, tested, and validated according to specifications.
Phase 0 Completion Summary
Completed Components
- Repository Structure - Full directory structure and configuration files created
- Core Interfaces - All interface definitions and model classes implemented
- Risk Management - BasicRiskManager with Tier 1 risk controls implemented
- Position Sizing - BasicPositionSizer with fixed contracts and fixed dollar risk methods implemented
- Test Suite - Comprehensive test suite with >90% coverage implemented
- Validation - Complete validation script executed successfully
- Documentation - SDK foundation and usage guidelines documented
Key Achievements
- All Phase 0 components functionally complete
- Comprehensive test coverage (>90%)
- Robust risk management with Tier 1 controls
- Flexible position sizing with multiple methods
- Well-documented architecture and implementation
Phase 1 Development Plan
Objectives
Phase 1 builds upon the completed Phase 0 foundation to deliver a more complete trading system with:
- Order Management System (OMS) with smart order routing
- NinjaTrader 8 adapter for integration
- Enhanced risk controls with Tier 2 functionality
- Market data handling and validation
- Performance optimization and advanced algorithms
Created Tasks
1. Order Management System (OMS)
Task ID: 074d41ec-2947-4efd-9d77-d85ed24c29bf Status: todo Feature: oms
Implementation of a comprehensive OMS with smart order routing and execution algorithms.
2. NinjaTrader 8 Adapter
Task ID: e5771a2f-e7bf-46ad-962e-b2ceb757e184 Status: todo Feature: nt8-adapter
Development of a robust adapter for integrating with NinjaTrader 8 platform.
3. Enhanced Risk Controls (Tier 2)
Task ID: 655c0a70-a5e4-449f-bad1-3f6bac9e70a6 Status: todo Feature: risk-management-tier2
Extension of the risk management system with advanced Tier 2 controls.
4. Market Data Handling
Task ID: 8d6c7fa7-9b97-41be-a44c-d26079ae04e7 Status: todo Feature: market-data
Implementation of comprehensive market data handling and validation.
5. Performance Optimization
Task ID: 597edb61-d818-4ed0-b6f0-6d55ec06a470 Status: todo Feature: performance
System performance optimization and advanced algorithms.
Next Steps
- Begin implementation of Phase 1 tasks following the Archon workflow
- Update task status from "todo" to "doing" when work begins
- Conduct research for each task using Archon's research capabilities
- Implement solutions based on research findings
- Update task status to "review" upon completion
- Create new tasks as needed for Phase 2 development
Success Criteria
- OMS implemented with smart order routing and execution algorithms
- NT8 adapter successfully integrated and tested
- Tier 2 risk controls operational with portfolio-level management
- Market data handling robust with quality validation
- System performance optimized with measurable improvements
- All new functionality covered by automated tests (>90% coverage)
- Documentation updated for all new components
Conclusion
The NT8 Institutional SDK is well-positioned for Phase 1 development with a solid architectural foundation and comprehensive testing framework in place. The transition from Phase 0 to Phase 1 has been smooth, with all deliverables completed on time and to specification.