6.3 KiB
NT8 Integration - Complete Specification Package
Created: February 17, 2026
Status: ✅ All Phases Specified, Ready for Execution
Total Estimated Time: 12-16 hours (3 phases)
📦 Specification Documents Created
Phase A: Foundation (4-5 hours)
File: PHASE_A_SPECIFICATION.md
Status: ✅ Complete
Deliverables:
- NT8DataConverterTests.cs (27 tests)
- NT8ExecutionAdapter.cs (order tracking & NT8 integration)
- NT8ExecutionAdapterTests.cs (15 tests)
What It Does:
- Tests existing data conversion logic
- Creates execution adapter for order submission
- Validates thread-safe order tracking
- Maps NT8 callbacks to SDK state
Phase B: Strategy Integration (4-5 hours)
File: PHASE_B_SPECIFICATION.md
Status: ✅ Complete
Deliverables:
- NT8StrategyBase.cs (~800-1000 lines)
- SimpleORBNT8.cs (~150-200 lines)
- MinimalTestStrategy.cs (~50 lines)
What It Does:
- Inherits from NinjaTrader Strategy class
- Implements NT8 lifecycle (OnStateChange, OnBarUpdate)
- Bridges NT8 events to SDK components
- Submits orders to NT8 platform
- Handles order/execution callbacks
Phase C: Deployment & Testing (3-4 hours)
File: PHASE_C_SPECIFICATION.md
Status: ✅ Complete
Deliverables:
- Deploy-To-NT8.ps1 (~300 lines)
- Verify-Deployment.ps1 (~100 lines)
- NT8IntegrationTests.cs (~500 lines, 15+ tests)
What It Does:
- Automates complete deployment process
- Verifies deployment status
- End-to-end integration tests
- Performance validation (<200ms)
- Thread safety validation
🎯 Complete Project Flow
Phase A (Foundation)
↓
Phase B (Strategy Integration)
↓
Phase C (Deployment & Testing)
↓
READY FOR NT8 LIVE TESTING
📋 Execution Instructions for Kilocode
Phase A
1. Read: PHASE_A_SPECIFICATION.md
2. Mode: Code Mode
3. Time: 4-5 hours
4. Deliverables: 3 files, 42 tests
5. Success: All tests pass, >90% coverage
Phase B (Start after Phase A complete)
1. Read: PHASE_B_SPECIFICATION.md
2. Mode: Code Mode
3. Time: 4-5 hours
4. Deliverables: 3 strategy files
5. Success: Compiles in NT8, runs without errors
Phase C (Start after Phase B complete)
1. Read: PHASE_C_SPECIFICATION.md
2. Mode: Code Mode
3. Time: 3-4 hours
4. Deliverables: 2 scripts, 15+ tests
5. Success: Automated deployment works, all tests pass
✅ Complete Success Criteria
Phase A Complete When:
- 27 NT8DataConverter tests passing
- NT8ExecutionAdapter implemented
- 15 ExecutionAdapter tests passing
- All 42 tests passing
- >90% code coverage
- Thread safety verified
- Committed to Git
Phase B Complete When:
- All 3 strategy files created
- Compiles in NT8 with zero errors
- MinimalTestStrategy runs
- SimpleORBNT8 initializes SDK
- SimpleORBNT8 generates trading intents
- SimpleORBNT8 submits orders
- Runs 1+ hours without errors
- Committed to Git
Phase C Complete When:
- Deploy-To-NT8.ps1 works
- Verify-Deployment.ps1 validates
- 15+ integration tests passing
- Performance <200ms
- Thread safety with 100 concurrent orders
- End-to-end workflow validated
- Committed to Git
🎯 After All Phases Complete
What You'll Have:
- ✅ Complete NT8 integration layer
- ✅ 240+ unit tests + 15+ integration tests
- ✅ Automated deployment tooling
- ✅ Performance validated (<200ms)
- ✅ Thread safety verified
- ✅ Ready for NT8 simulation testing
Next Steps (Manual):
- Deploy to NT8 using script
- Compile in NinjaScript Editor
- Test MinimalTestStrategy on chart
- Test SimpleORBNT8 on simulation
- Run 24-hour simulation test
- Validate risk controls
- Move to production (gradually)
📊 Summary Statistics
Total Deliverables:
- Source Files: 6 (3 adapters, 3 strategies)
- Test Files: 3
- Scripts: 2
- Total Lines of Code: ~3,500-4,000
- Total Tests: 57+ (42 Phase A, 15+ Phase C)
Total Time:
- Phase A: 4-5 hours
- Phase B: 4-5 hours
- Phase C: 3-4 hours
- Total: 11-14 hours
Quality Metrics:
- Code coverage: >90%
- Performance: <200ms
- Thread safety: 100 concurrent orders
- Zero warnings: Yes
🚀 Kilocode Execution Plan
Week 1: Phase A (Monday-Tuesday)
- Monday morning: Start Phase A
- Monday afternoon: Complete Phase A
- Monday evening: Verify & commit
- Tuesday: Buffer for issues
Week 1: Phase B (Wednesday-Thursday)
- Wednesday morning: Start Phase B
- Wednesday afternoon: Complete Phase B
- Wednesday evening: Test in NT8
- Thursday: Debugging & refinement
Week 1: Phase C (Friday)
- Friday morning: Start Phase C
- Friday afternoon: Complete Phase C
- Friday evening: Full integration test
Week 2: Validation
- Monday-Friday: NT8 simulation testing
- Document issues
- Refine as needed
- Prepare for production
📚 Reference Documents
Architecture:
ARCHITECTURE.md- System designAPI_REFERENCE.md- API documentationNT8_INTEGRATION_IMPLEMENTATION_PLAN.md- High-level plan
Specifications:
PHASE_A_SPECIFICATION.md- Foundation (THIS)PHASE_B_SPECIFICATION.md- Strategy integrationPHASE_C_SPECIFICATION.md- Deployment & testing
Project Context:
PROJECT_HANDOVER.md- Overall project statusNEXT_STEPS_RECOMMENDED.md- Post-integration roadmap
🎯 Current Status
Phase 5 (Analytics): ✅ Complete (240+ tests passing)
Phase A (NT8 Foundation): 📝 Specification complete, ready for Kilocode
Phase B (Strategy Integration): 📝 Specification complete, waiting for Phase A
Phase C (Deployment): 📝 Specification complete, waiting for Phase B
Overall Project: ~85% complete
After NT8 Integration: ~95% complete
Remaining: Production hardening, live deployment
✅ Ready for Handoff to Kilocode
All three phases are fully specified with:
- ✅ Complete technical requirements
- ✅ Detailed code specifications
- ✅ Comprehensive test requirements
- ✅ Success criteria defined
- ✅ Constraints documented
- ✅ Step-by-step workflows
- ✅ Git commit templates
Kilocode can now execute all three phases autonomously with minimal supervision.
Total Documentation Created: 4 specification files, ~5,000 lines of detailed specs
Ready to begin Phase A! 🚀