5.8 KiB
NT8 Integration - Phase A Ready for Kilocode
Date: February 17, 2026
Status: ✅ Specifications Complete, Ready for Handoff
Agent: Kilocode (Code Mode)
Estimated Time: 4-5 hours
📋 What's Ready
I've created detailed specification documents for Kilocode to execute Phase A autonomously:
Primary Specification
File: C:\dev\nt8-sdk\PHASE_A_SPECIFICATION.md
Contents:
-
Task 1: NT8 Data Adapter Unit Tests (2 hours)
- 27 comprehensive unit tests for NT8DataConverter
- Covers all conversion methods (Bar, Account, Position, Session, Context)
-
95% code coverage target
-
Task 2: NT8ExecutionAdapter Implementation (2-3 hours)
- Complete adapter for order submission to NT8
- Thread-safe order tracking
- NT8 callback processing (order updates, executions)
- 15 comprehensive unit tests
-
90% code coverage target
Total Deliverables: 42 new tests + 1 new adapter class
🎯 Phase A Objectives
What Phase A Accomplishes
Foundation for NT8 Integration:
- ✅ Validates existing data conversion logic with comprehensive tests
- ✅ Creates order execution adapter that bridges SDK ↔ NT8
- ✅ Establishes thread-safe order state tracking
- ✅ Handles NT8 callbacks (OnOrderUpdate, OnExecutionUpdate)
- ✅ Maps NT8 order states to SDK OrderState enum
Why Phase A is Critical:
- These adapters are used by Phase B (NT8StrategyBase)
- Must be rock-solid before building strategy layer
- Thread safety is essential for NT8's multi-threaded callbacks
- Test coverage gives confidence in conversion logic
📦 Deliverables
Files Kilocode Will Create
-
tests/NT8.Core.Tests/Adapters/NT8DataConverterTests.cs- 27 unit tests
- Tests all conversion methods
- Validates error handling
-
src/NT8.Adapters/NinjaTrader/NT8ExecutionAdapter.cs- Order submission tracking
- NT8 callback processing
- Thread-safe state management
- ~300-400 lines of code
-
tests/NT8.Core.Tests/Adapters/NT8ExecutionAdapterTests.cs- 15 unit tests
- Thread safety validation
- Order lifecycle testing
✅ Success Criteria
Phase A is complete when:
- All 42 new tests passing
- All existing 240+ tests still passing
- Zero build warnings
- Code coverage: >95% DataConverter, >90% ExecutionAdapter
- Thread safety verified
- C# 5.0 compliant (no modern syntax)
- Committed to Git with clear message
🔄 Next Steps (After Phase A)
Once Phase A is complete, we move to:
Phase B: NT8StrategyBase (4-5 hours)
- Inherit from NinjaTrader.NinjaScript.Strategies.Strategy
- Implement NT8 lifecycle (OnStateChange, OnBarUpdate, etc.)
- Bridge NT8 events to SDK components
- Create SimpleORBNT8 concrete strategy
Phase C: Deployment & Testing (3-4 hours)
- Create deployment automation script
- Deploy to NT8 and compile
- Run integration tests in simulation
- Validate risk controls
📝 Kilocode Instructions
How to Execute
Mode: Code Mode (detailed implementation from specification)
Command for Kilocode:
Implement Phase A per detailed specification in PHASE_A_SPECIFICATION.md
Requirements:
- Follow specification exactly
- C# 5.0 syntax only (no modern features)
- Thread-safe with lock protection
- Comprehensive XML documentation
- All tests must pass
- Zero build warnings
Deliverables:
1. NT8DataConverterTests.cs (27 tests)
2. NT8ExecutionAdapter.cs (implementation)
3. NT8ExecutionAdapterTests.cs (15 tests)
Success criteria:
- 42 tests passing
- 240+ existing tests still passing
- >90% coverage
- Committed to Git
Files Kilocode Needs
Specification:
C:\dev\nt8-sdk\PHASE_A_SPECIFICATION.md(detailed requirements)
Existing Code to Reference:
src/NT8.Adapters/NinjaTrader/NT8DataConverter.cs(code being tested)src/NT8.Adapters/NinjaTrader/NT8DataAdapter.cs(wrapper around converter)src/NT8.Core/OMS/OrderModels.cs(OrderRequest, OrderStatus, OrderState)tests/NT8.Core.Tests/(existing test patterns)
Build Tools:
verify-build.bat(build verification)dotnet build(compilation)dotnet test(test execution)
🚨 Key Constraints for Kilocode
-
C# 5.0 Only
- ❌ No
async/await - ❌ No
$"string interpolation" - ❌ No
=>expression bodies - ✅ Use
string.Format() - ✅ Use traditional methods
- ❌ No
-
Thread Safety
- ✅ All shared state protected with
lock (_lock) - ✅ Lock scope minimized
- ✅ No blocking operations inside locks
- ✅ All shared state protected with
-
Error Handling
- ✅ Validate all inputs
- ✅ Throw appropriate exceptions
- ✅ Add error messages with context
-
Documentation
- ✅ XML comments on all public members
- ✅ Clear parameter descriptions
- ✅ Exception documentation
-
Testing
- ✅ Use xUnit + FluentAssertions
- ✅ Follow AAA pattern (Arrange, Act, Assert)
- ✅ Clear test names
- ✅ Test both happy and error paths
📊 Estimated Timeline
Task 1: NT8 Data Adapter Tests → 2 hours
Task 2: NT8ExecutionAdapter Implementation → 2 hours
Task 3: NT8ExecutionAdapter Tests → 1 hour
Total: 4-5 hours
✅ Approval Checklist
Before handing to Kilocode, verify:
- PHASE_A_SPECIFICATION.md is complete and detailed
- All requirements are clear and testable
- Success criteria are well-defined
- Constraints are documented
- Existing code references are provided
- Git commit instructions are clear
🎯 Ready for Handoff
Status: ✅ READY
To proceed:
- Review PHASE_A_SPECIFICATION.md
- Approve specification
- Launch Kilocode in Code Mode
- Provide specification file path
- Monitor progress
- Verify deliverables against success criteria
All documentation is complete. Ready to hand off to Kilocode for autonomous execution. 🚀