Files
nt8-sdk/docs/00-governance/roadmap.md

906 B

Roadmap

Sprint 2 (Active): SIM Validation

  • Validate dual-leg execution behavior with log evidence.
  • Complete remaining safety/consistency fixes tied to active gap list.
  • Exit criteria: stable SIM behavior with no unresolved critical gaps.

Sprint 3: Production Hardening

  • Implement CI build/test automation and operational alerting.
  • Complete lower-priority runtime consistency and observability improvements.
  • Add walk-forward and broader validation coverage beyond in-sample checks.

Sprint 4: Live Capital Readiness

  • Gate on sustained SIM metrics and drawdown controls.
  • Introduce go-live runbook and operational controls for controlled capital exposure.

Sprint 5: ML Extension (Deferred)

  • Add inference integration only after sufficient live/sim data and stable production operations.

Sequencing Rule

  • No feature expansion ahead of unresolved safety and validation gates.