# Roadmap ## Sprint 2 (Active): SIM Validation - Validate dual-leg execution behavior with log evidence. - Complete remaining safety/consistency fixes tied to active gap list. - Exit criteria: stable SIM behavior with no unresolved critical gaps. ## Sprint 3: Production Hardening - Implement CI build/test automation and operational alerting. - Complete lower-priority runtime consistency and observability improvements. - Add walk-forward and broader validation coverage beyond in-sample checks. ## Sprint 4: Live Capital Readiness - Gate on sustained SIM metrics and drawdown controls. - Introduce go-live runbook and operational controls for controlled capital exposure. ## Sprint 5: ML Extension (Deferred) - Add inference integration only after sufficient live/sim data and stable production operations. ## Sequencing Rule - No feature expansion ahead of unresolved safety and validation gates.