Production hardening: kill switch, circuit breaker, trailing stops, log level, holiday calendar
Some checks failed
Build and Test / build (push) Has been cancelled
Some checks failed
Build and Test / build (push) Has been cancelled
This commit is contained in:
221
PHASE_A_READY_FOR_KILOCODE.md
Normal file
221
PHASE_A_READY_FOR_KILOCODE.md
Normal file
@@ -0,0 +1,221 @@
|
||||
# NT8 Integration - Phase A Ready for Kilocode
|
||||
|
||||
**Date:** February 17, 2026
|
||||
**Status:** ✅ Specifications Complete, Ready for Handoff
|
||||
**Agent:** Kilocode (Code Mode)
|
||||
**Estimated Time:** 4-5 hours
|
||||
|
||||
---
|
||||
|
||||
## 📋 What's Ready
|
||||
|
||||
I've created detailed specification documents for Kilocode to execute Phase A autonomously:
|
||||
|
||||
### **Primary Specification**
|
||||
**File:** `C:\dev\nt8-sdk\PHASE_A_SPECIFICATION.md`
|
||||
|
||||
**Contents:**
|
||||
1. **Task 1:** NT8 Data Adapter Unit Tests (2 hours)
|
||||
- 27 comprehensive unit tests for NT8DataConverter
|
||||
- Covers all conversion methods (Bar, Account, Position, Session, Context)
|
||||
- >95% code coverage target
|
||||
|
||||
2. **Task 2:** NT8ExecutionAdapter Implementation (2-3 hours)
|
||||
- Complete adapter for order submission to NT8
|
||||
- Thread-safe order tracking
|
||||
- NT8 callback processing (order updates, executions)
|
||||
- 15 comprehensive unit tests
|
||||
- >90% code coverage target
|
||||
|
||||
**Total Deliverables:** 42 new tests + 1 new adapter class
|
||||
|
||||
---
|
||||
|
||||
## 🎯 Phase A Objectives
|
||||
|
||||
### What Phase A Accomplishes
|
||||
|
||||
**Foundation for NT8 Integration:**
|
||||
- ✅ Validates existing data conversion logic with comprehensive tests
|
||||
- ✅ Creates order execution adapter that bridges SDK ↔ NT8
|
||||
- ✅ Establishes thread-safe order state tracking
|
||||
- ✅ Handles NT8 callbacks (OnOrderUpdate, OnExecutionUpdate)
|
||||
- ✅ Maps NT8 order states to SDK OrderState enum
|
||||
|
||||
**Why Phase A is Critical:**
|
||||
- These adapters are used by Phase B (NT8StrategyBase)
|
||||
- Must be rock-solid before building strategy layer
|
||||
- Thread safety is essential for NT8's multi-threaded callbacks
|
||||
- Test coverage gives confidence in conversion logic
|
||||
|
||||
---
|
||||
|
||||
## 📦 Deliverables
|
||||
|
||||
### Files Kilocode Will Create
|
||||
|
||||
1. **`tests/NT8.Core.Tests/Adapters/NT8DataConverterTests.cs`**
|
||||
- 27 unit tests
|
||||
- Tests all conversion methods
|
||||
- Validates error handling
|
||||
|
||||
2. **`src/NT8.Adapters/NinjaTrader/NT8ExecutionAdapter.cs`**
|
||||
- Order submission tracking
|
||||
- NT8 callback processing
|
||||
- Thread-safe state management
|
||||
- ~300-400 lines of code
|
||||
|
||||
3. **`tests/NT8.Core.Tests/Adapters/NT8ExecutionAdapterTests.cs`**
|
||||
- 15 unit tests
|
||||
- Thread safety validation
|
||||
- Order lifecycle testing
|
||||
|
||||
---
|
||||
|
||||
## ✅ Success Criteria
|
||||
|
||||
**Phase A is complete when:**
|
||||
- [ ] All 42 new tests passing
|
||||
- [ ] All existing 240+ tests still passing
|
||||
- [ ] Zero build warnings
|
||||
- [ ] Code coverage: >95% DataConverter, >90% ExecutionAdapter
|
||||
- [ ] Thread safety verified
|
||||
- [ ] C# 5.0 compliant (no modern syntax)
|
||||
- [ ] Committed to Git with clear message
|
||||
|
||||
---
|
||||
|
||||
## 🔄 Next Steps (After Phase A)
|
||||
|
||||
Once Phase A is complete, we move to:
|
||||
|
||||
**Phase B: NT8StrategyBase** (4-5 hours)
|
||||
- Inherit from NinjaTrader.NinjaScript.Strategies.Strategy
|
||||
- Implement NT8 lifecycle (OnStateChange, OnBarUpdate, etc.)
|
||||
- Bridge NT8 events to SDK components
|
||||
- Create SimpleORBNT8 concrete strategy
|
||||
|
||||
**Phase C: Deployment & Testing** (3-4 hours)
|
||||
- Create deployment automation script
|
||||
- Deploy to NT8 and compile
|
||||
- Run integration tests in simulation
|
||||
- Validate risk controls
|
||||
|
||||
---
|
||||
|
||||
## 📝 Kilocode Instructions
|
||||
|
||||
### How to Execute
|
||||
|
||||
**Mode:** Code Mode (detailed implementation from specification)
|
||||
|
||||
**Command for Kilocode:**
|
||||
```
|
||||
Implement Phase A per detailed specification in PHASE_A_SPECIFICATION.md
|
||||
|
||||
Requirements:
|
||||
- Follow specification exactly
|
||||
- C# 5.0 syntax only (no modern features)
|
||||
- Thread-safe with lock protection
|
||||
- Comprehensive XML documentation
|
||||
- All tests must pass
|
||||
- Zero build warnings
|
||||
|
||||
Deliverables:
|
||||
1. NT8DataConverterTests.cs (27 tests)
|
||||
2. NT8ExecutionAdapter.cs (implementation)
|
||||
3. NT8ExecutionAdapterTests.cs (15 tests)
|
||||
|
||||
Success criteria:
|
||||
- 42 tests passing
|
||||
- 240+ existing tests still passing
|
||||
- >90% coverage
|
||||
- Committed to Git
|
||||
```
|
||||
|
||||
### Files Kilocode Needs
|
||||
|
||||
**Specification:**
|
||||
- `C:\dev\nt8-sdk\PHASE_A_SPECIFICATION.md` (detailed requirements)
|
||||
|
||||
**Existing Code to Reference:**
|
||||
- `src/NT8.Adapters/NinjaTrader/NT8DataConverter.cs` (code being tested)
|
||||
- `src/NT8.Adapters/NinjaTrader/NT8DataAdapter.cs` (wrapper around converter)
|
||||
- `src/NT8.Core/OMS/OrderModels.cs` (OrderRequest, OrderStatus, OrderState)
|
||||
- `tests/NT8.Core.Tests/` (existing test patterns)
|
||||
|
||||
**Build Tools:**
|
||||
- `verify-build.bat` (build verification)
|
||||
- `dotnet build` (compilation)
|
||||
- `dotnet test` (test execution)
|
||||
|
||||
---
|
||||
|
||||
## 🚨 Key Constraints for Kilocode
|
||||
|
||||
1. **C# 5.0 Only**
|
||||
- ❌ No `async/await`
|
||||
- ❌ No `$"string interpolation"`
|
||||
- ❌ No `=>` expression bodies
|
||||
- ✅ Use `string.Format()`
|
||||
- ✅ Use traditional methods
|
||||
|
||||
2. **Thread Safety**
|
||||
- ✅ All shared state protected with `lock (_lock)`
|
||||
- ✅ Lock scope minimized
|
||||
- ✅ No blocking operations inside locks
|
||||
|
||||
3. **Error Handling**
|
||||
- ✅ Validate all inputs
|
||||
- ✅ Throw appropriate exceptions
|
||||
- ✅ Add error messages with context
|
||||
|
||||
4. **Documentation**
|
||||
- ✅ XML comments on all public members
|
||||
- ✅ Clear parameter descriptions
|
||||
- ✅ Exception documentation
|
||||
|
||||
5. **Testing**
|
||||
- ✅ Use xUnit + FluentAssertions
|
||||
- ✅ Follow AAA pattern (Arrange, Act, Assert)
|
||||
- ✅ Clear test names
|
||||
- ✅ Test both happy and error paths
|
||||
|
||||
---
|
||||
|
||||
## 📊 Estimated Timeline
|
||||
|
||||
**Task 1:** NT8 Data Adapter Tests → 2 hours
|
||||
**Task 2:** NT8ExecutionAdapter Implementation → 2 hours
|
||||
**Task 3:** NT8ExecutionAdapter Tests → 1 hour
|
||||
**Total:** 4-5 hours
|
||||
|
||||
---
|
||||
|
||||
## ✅ Approval Checklist
|
||||
|
||||
Before handing to Kilocode, verify:
|
||||
- [x] PHASE_A_SPECIFICATION.md is complete and detailed
|
||||
- [x] All requirements are clear and testable
|
||||
- [x] Success criteria are well-defined
|
||||
- [x] Constraints are documented
|
||||
- [x] Existing code references are provided
|
||||
- [x] Git commit instructions are clear
|
||||
|
||||
---
|
||||
|
||||
## 🎯 Ready for Handoff
|
||||
|
||||
**Status:** ✅ **READY**
|
||||
|
||||
**To proceed:**
|
||||
1. Review PHASE_A_SPECIFICATION.md
|
||||
2. Approve specification
|
||||
3. Launch Kilocode in Code Mode
|
||||
4. Provide specification file path
|
||||
5. Monitor progress
|
||||
6. Verify deliverables against success criteria
|
||||
|
||||
---
|
||||
|
||||
**All documentation is complete. Ready to hand off to Kilocode for autonomous execution.** 🚀
|
||||
Reference in New Issue
Block a user