Production hardening: kill switch, circuit breaker, trailing stops, log level, holiday calendar
Some checks failed
Build and Test / build (push) Has been cancelled
Some checks failed
Build and Test / build (push) Has been cancelled
This commit is contained in:
260
NT8_INTEGRATION_COMPLETE_SPECS.md
Normal file
260
NT8_INTEGRATION_COMPLETE_SPECS.md
Normal file
@@ -0,0 +1,260 @@
|
||||
# NT8 Integration - Complete Specification Package
|
||||
|
||||
**Created:** February 17, 2026
|
||||
**Status:** ✅ All Phases Specified, Ready for Execution
|
||||
**Total Estimated Time:** 12-16 hours (3 phases)
|
||||
|
||||
---
|
||||
|
||||
## 📦 Specification Documents Created
|
||||
|
||||
### Phase A: Foundation (4-5 hours)
|
||||
**File:** `PHASE_A_SPECIFICATION.md`
|
||||
**Status:** ✅ Complete
|
||||
|
||||
**Deliverables:**
|
||||
- NT8DataConverterTests.cs (27 tests)
|
||||
- NT8ExecutionAdapter.cs (order tracking & NT8 integration)
|
||||
- NT8ExecutionAdapterTests.cs (15 tests)
|
||||
|
||||
**What It Does:**
|
||||
- Tests existing data conversion logic
|
||||
- Creates execution adapter for order submission
|
||||
- Validates thread-safe order tracking
|
||||
- Maps NT8 callbacks to SDK state
|
||||
|
||||
---
|
||||
|
||||
### Phase B: Strategy Integration (4-5 hours)
|
||||
**File:** `PHASE_B_SPECIFICATION.md`
|
||||
**Status:** ✅ Complete
|
||||
|
||||
**Deliverables:**
|
||||
- NT8StrategyBase.cs (~800-1000 lines)
|
||||
- SimpleORBNT8.cs (~150-200 lines)
|
||||
- MinimalTestStrategy.cs (~50 lines)
|
||||
|
||||
**What It Does:**
|
||||
- Inherits from NinjaTrader Strategy class
|
||||
- Implements NT8 lifecycle (OnStateChange, OnBarUpdate)
|
||||
- Bridges NT8 events to SDK components
|
||||
- Submits orders to NT8 platform
|
||||
- Handles order/execution callbacks
|
||||
|
||||
---
|
||||
|
||||
### Phase C: Deployment & Testing (3-4 hours)
|
||||
**File:** `PHASE_C_SPECIFICATION.md`
|
||||
**Status:** ✅ Complete
|
||||
|
||||
**Deliverables:**
|
||||
- Deploy-To-NT8.ps1 (~300 lines)
|
||||
- Verify-Deployment.ps1 (~100 lines)
|
||||
- NT8IntegrationTests.cs (~500 lines, 15+ tests)
|
||||
|
||||
**What It Does:**
|
||||
- Automates complete deployment process
|
||||
- Verifies deployment status
|
||||
- End-to-end integration tests
|
||||
- Performance validation (<200ms)
|
||||
- Thread safety validation
|
||||
|
||||
---
|
||||
|
||||
## 🎯 Complete Project Flow
|
||||
|
||||
```
|
||||
Phase A (Foundation)
|
||||
↓
|
||||
Phase B (Strategy Integration)
|
||||
↓
|
||||
Phase C (Deployment & Testing)
|
||||
↓
|
||||
READY FOR NT8 LIVE TESTING
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## 📋 Execution Instructions for Kilocode
|
||||
|
||||
### Phase A
|
||||
```
|
||||
1. Read: PHASE_A_SPECIFICATION.md
|
||||
2. Mode: Code Mode
|
||||
3. Time: 4-5 hours
|
||||
4. Deliverables: 3 files, 42 tests
|
||||
5. Success: All tests pass, >90% coverage
|
||||
```
|
||||
|
||||
### Phase B (Start after Phase A complete)
|
||||
```
|
||||
1. Read: PHASE_B_SPECIFICATION.md
|
||||
2. Mode: Code Mode
|
||||
3. Time: 4-5 hours
|
||||
4. Deliverables: 3 strategy files
|
||||
5. Success: Compiles in NT8, runs without errors
|
||||
```
|
||||
|
||||
### Phase C (Start after Phase B complete)
|
||||
```
|
||||
1. Read: PHASE_C_SPECIFICATION.md
|
||||
2. Mode: Code Mode
|
||||
3. Time: 3-4 hours
|
||||
4. Deliverables: 2 scripts, 15+ tests
|
||||
5. Success: Automated deployment works, all tests pass
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## ✅ Complete Success Criteria
|
||||
|
||||
### Phase A Complete When:
|
||||
- [ ] 27 NT8DataConverter tests passing
|
||||
- [ ] NT8ExecutionAdapter implemented
|
||||
- [ ] 15 ExecutionAdapter tests passing
|
||||
- [ ] All 42 tests passing
|
||||
- [ ] >90% code coverage
|
||||
- [ ] Thread safety verified
|
||||
- [ ] Committed to Git
|
||||
|
||||
### Phase B Complete When:
|
||||
- [ ] All 3 strategy files created
|
||||
- [ ] Compiles in NT8 with zero errors
|
||||
- [ ] MinimalTestStrategy runs
|
||||
- [ ] SimpleORBNT8 initializes SDK
|
||||
- [ ] SimpleORBNT8 generates trading intents
|
||||
- [ ] SimpleORBNT8 submits orders
|
||||
- [ ] Runs 1+ hours without errors
|
||||
- [ ] Committed to Git
|
||||
|
||||
### Phase C Complete When:
|
||||
- [ ] Deploy-To-NT8.ps1 works
|
||||
- [ ] Verify-Deployment.ps1 validates
|
||||
- [ ] 15+ integration tests passing
|
||||
- [ ] Performance <200ms
|
||||
- [ ] Thread safety with 100 concurrent orders
|
||||
- [ ] End-to-end workflow validated
|
||||
- [ ] Committed to Git
|
||||
|
||||
---
|
||||
|
||||
## 🎯 After All Phases Complete
|
||||
|
||||
### What You'll Have:
|
||||
1. ✅ Complete NT8 integration layer
|
||||
2. ✅ 240+ unit tests + 15+ integration tests
|
||||
3. ✅ Automated deployment tooling
|
||||
4. ✅ Performance validated (<200ms)
|
||||
5. ✅ Thread safety verified
|
||||
6. ✅ Ready for NT8 simulation testing
|
||||
|
||||
### Next Steps (Manual):
|
||||
1. Deploy to NT8 using script
|
||||
2. Compile in NinjaScript Editor
|
||||
3. Test MinimalTestStrategy on chart
|
||||
4. Test SimpleORBNT8 on simulation
|
||||
5. Run 24-hour simulation test
|
||||
6. Validate risk controls
|
||||
7. Move to production (gradually)
|
||||
|
||||
---
|
||||
|
||||
## 📊 Summary Statistics
|
||||
|
||||
**Total Deliverables:**
|
||||
- Source Files: 6 (3 adapters, 3 strategies)
|
||||
- Test Files: 3
|
||||
- Scripts: 2
|
||||
- Total Lines of Code: ~3,500-4,000
|
||||
- Total Tests: 57+ (42 Phase A, 15+ Phase C)
|
||||
|
||||
**Total Time:**
|
||||
- Phase A: 4-5 hours
|
||||
- Phase B: 4-5 hours
|
||||
- Phase C: 3-4 hours
|
||||
- **Total: 11-14 hours**
|
||||
|
||||
**Quality Metrics:**
|
||||
- Code coverage: >90%
|
||||
- Performance: <200ms
|
||||
- Thread safety: 100 concurrent orders
|
||||
- Zero warnings: Yes
|
||||
|
||||
---
|
||||
|
||||
## 🚀 Kilocode Execution Plan
|
||||
|
||||
### Week 1: Phase A (Monday-Tuesday)
|
||||
- Monday morning: Start Phase A
|
||||
- Monday afternoon: Complete Phase A
|
||||
- Monday evening: Verify & commit
|
||||
- Tuesday: Buffer for issues
|
||||
|
||||
### Week 1: Phase B (Wednesday-Thursday)
|
||||
- Wednesday morning: Start Phase B
|
||||
- Wednesday afternoon: Complete Phase B
|
||||
- Wednesday evening: Test in NT8
|
||||
- Thursday: Debugging & refinement
|
||||
|
||||
### Week 1: Phase C (Friday)
|
||||
- Friday morning: Start Phase C
|
||||
- Friday afternoon: Complete Phase C
|
||||
- Friday evening: Full integration test
|
||||
|
||||
### Week 2: Validation
|
||||
- Monday-Friday: NT8 simulation testing
|
||||
- Document issues
|
||||
- Refine as needed
|
||||
- Prepare for production
|
||||
|
||||
---
|
||||
|
||||
## 📚 Reference Documents
|
||||
|
||||
**Architecture:**
|
||||
- `ARCHITECTURE.md` - System design
|
||||
- `API_REFERENCE.md` - API documentation
|
||||
- `NT8_INTEGRATION_IMPLEMENTATION_PLAN.md` - High-level plan
|
||||
|
||||
**Specifications:**
|
||||
- `PHASE_A_SPECIFICATION.md` - Foundation (THIS)
|
||||
- `PHASE_B_SPECIFICATION.md` - Strategy integration
|
||||
- `PHASE_C_SPECIFICATION.md` - Deployment & testing
|
||||
|
||||
**Project Context:**
|
||||
- `PROJECT_HANDOVER.md` - Overall project status
|
||||
- `NEXT_STEPS_RECOMMENDED.md` - Post-integration roadmap
|
||||
|
||||
---
|
||||
|
||||
## 🎯 Current Status
|
||||
|
||||
**Phase 5 (Analytics):** ✅ Complete (240+ tests passing)
|
||||
**Phase A (NT8 Foundation):** 📝 Specification complete, ready for Kilocode
|
||||
**Phase B (Strategy Integration):** 📝 Specification complete, waiting for Phase A
|
||||
**Phase C (Deployment):** 📝 Specification complete, waiting for Phase B
|
||||
|
||||
**Overall Project:** ~85% complete
|
||||
**After NT8 Integration:** ~95% complete
|
||||
**Remaining:** Production hardening, live deployment
|
||||
|
||||
---
|
||||
|
||||
## ✅ Ready for Handoff to Kilocode
|
||||
|
||||
All three phases are fully specified with:
|
||||
- ✅ Complete technical requirements
|
||||
- ✅ Detailed code specifications
|
||||
- ✅ Comprehensive test requirements
|
||||
- ✅ Success criteria defined
|
||||
- ✅ Constraints documented
|
||||
- ✅ Step-by-step workflows
|
||||
- ✅ Git commit templates
|
||||
|
||||
**Kilocode can now execute all three phases autonomously with minimal supervision.**
|
||||
|
||||
---
|
||||
|
||||
**Total Documentation Created:** 4 specification files, ~5,000 lines of detailed specs
|
||||
|
||||
**Ready to begin Phase A!** 🚀
|
||||
Reference in New Issue
Block a user