# NT8 Institutional SDK - Phase 1 Sprint Plan
# NT8-SDK — Sprint Board
**Last Updated:** 2026-03-27 | **Active Sprint:** Sprint 2
## Overview
This document outlines the sprint plan for Phase 1 development of the NT8 Institutional SDK. Phase 1 builds upon the completed Phase 0 foundation to deliver a more complete trading system with Order Management System (OMS), NinjaTrader 8 integration, enhanced risk controls, and market data handling.
---
## Sprint 2 — SIM Validation (ACTIVE)
**Goal:** Strategy runs unattended 2+ weeks in SIM with correct dual-leg execution.
**Gate:** Zero unhandled exceptions, both scaler and runner filling (Qty=2 in log), daily loss limit never accidentally triggered.
| # | Task | Status | Notes |
|---|---|---|---|
| S2-01 | Restore `EntriesPerDirection=2` | ✅ Done | Deployed 2026-03-27 |
| S2-02 | `MaxOpenPositions=2` in SimpleORBNT8 | ✅ Done | Deployed 2026-03-27 |
| S2-03 | `_realtimeBarSeen` replay guard | ✅ Done | Blocks live replay burst, allows backtest |
| S2-04 | `State.Historical` guard in ProcessStrategyIntent | ✅ Done | Restores backtest execution |
| S2-05 | Validate runner leg — Qty=2 in session log | ⬜ Pending | Run backtest after S2-01 |
| S2-06 | Risk parameter consistency validation | ⬜ Pending | Assert RiskPerTrade ≤ MaxTradeRisk |
| S2-07 | SIM unattended run 2+ weeks | ▶ In progress | Started 2026-03-27 |
| S2-08 | Walk-forward backtest split | ⬜ Pending | MarSep 2025 train / OctMar 2026 test |
| S2-09 | BX68915-15 prop firm re-enable | 🔴 Blocked | Gate: S2-05 + S2-07 pass |
---
## Sprint 3 — Production Hardening
**Goal:** 30-day SIM run clean. CI and alerts live.
| # | Task | Status | Notes |
|---|---|---|---|
| S3-01 | Gitea CI — build + test on push | ⬜ Pending | `.gitea/workflows/build.yml` |
| S3-02 | n8n webhook — fills + risk events | ⬜ Pending | HTTP POST from NT8StrategyBase |
| S3-03 | Fix `GetRiskStatus()` hardcoded limit | ⬜ Pending | Read from registered strategy config |
| S3-04 | `orbRangeTicks` wiring in DailyBarContext | ⬜ Pending | Low priority |
| S3-05 | Short-side regime filter | ⬜ Pending | 20-day MA or VIX-based gate |
| S3-06 | Tick replay validation | ⬜ Pending | 30-day window |
| S3-07 | VWAPMeanReversion strategy skeleton | ⬜ Pending | New IStrategy implementation |
---
## Sprint 4 — Live Capital
**Gate:** 30-day SIM pass rate > 70%, PF > 2.0, max drawdown < $500
| # | Task | Status |
|---|---|---|
| S4-01 | Go live 1 NQ contract | ⬜ Pending gate |
| S4-02 | OvernightGapContinuation strategy | ⬜ Pending |
| S4-03 | OvernightGapReversion strategy | ⬜ Pending |
| S4-04 | Ops runbook and emergency procedures | ⬜ Pending |
| S4-05 | Connection loss recovery testing | ⬜ Pending |
| S4-06 | CME holiday filter | ⬜ Pending |
---
## Sprint 5 — ML Inference
**Prerequisite:** 60 days of live trading data.
| # | Task |
|---|---|
| S5-01 | FastAPI /predict endpoint on Ollama workstation |
| S5-02 | HTTP client in SimpleORBStrategy |
| S5-03 | MLSignalFactorCalculator as IFactorCalculator |
| S5-04 | Feature engineering from live trade history |
| S5-05 | A/B test: with vs without ML factor |
---
## Completed (Historical)
| Task | Sprint | Completed |
|---|---|---|
| Execute trades in NT8 SIM (execution bridge wired) | Sprint 1 | 2026-03-27 |
| Historical replay burst fix | Sprint 1 | 2026-03-27 |
| NR7 warm-up guard | Phase 4 | 2026-02 |
| 10-factor confluence scoring engine | Phase 4 | 2026-02 |
| PortfolioRiskManager singleton | Phase 4 | 2026-02 |
| Analytics layer (240+ tests) | Phase 5 | 2026-02-16 |
| Breakeven + runner trail logic | Sprint 1 | 2026-03 |
| Connection loss detection | Sprint 1 | 2026-03 |
| File logging + settings export | Sprint 1 | 2026-03 |
---
## Backtest Results History
| Date | Period | Trades | Win% | PF | Net | Config |
|---|---|---|---|---|---|---|
| 2026-03-27 | JanMar 2026 | 20 | 75% | 7.00 | $1,200 | trail=20, grade=B ✅ Use this |
| 2026-03-27 | JanMar 2026 | 40 | 75% | 3.69 | $1,075 | trail=12, grade=B |
| 2026-03-27 | Mar 2025Mar 2026 | 148 | 51% | 3.15 | $71,303 | 9 cts experimental |
**Note:** The 148-trade run used `RiskPerTrade=$500` producing 9 contracts AND had `EntriesPerDirection=1` blocking the runner. Not a production reference. Re-run required post Sprint 2.
---
# ARCHIVED BELOW — Phase 1 Sprint Plan (2025-09-15, superseded)
## Overview (ARCHIVED)
This document originally outlined Phase 1 sprint planning from September 2025.
## Sprint Goals
1. Implement Order Management System (OMS) with smart order routing